Copper play DSM.V

Discussion in 'Canadian Stocks Message Boards' started by Rickydi, Feb 18, 2021.

Tags:
  1. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    https://www.stockwatch.com/News/Item/U-th1BQPF1Orr-U!DSMTF-20210518/U/DSMTF

    Deep-South to Host Live Webinar on Monday, May 24th at 2pm ET

    2021-05-18 10:07 ET - News Release

    (via TheNewswire)

    Vancouver, B.C., Canada – TheNewswire - May 18, 2021 – Deep-South Resources Inc. ("Deep-South" or “the Company") (TSXV:DSM) (OTC:DSMTF) today announced that Pierre Leveille, President & CEO, will be hosting a live investor webinar on Monday, May 24 th to go through the Company’s May investor presentation including an overview of current operations and upcoming milestones.

    You can register for the webinar below:

    Date : Monday, May 24 th , 2021 Time : 2pm EST

    Register : Webinar Registration

    (http://7514767.hs-sites.com/www.rbm...kmjg1E9VoYUg2niKom_VHB-PKcNAVKweAo4zMJXoo8ltd)

    HAVE QUESTIONS? Management will be available to answer your questions following the presentation on the webinar platform. You may also submit your question(s) beforehand via email to [email protected]

    About Deep-South Resources Inc

    Deep-South Resources is a mineral exploration and development company. Deep-South holds 100% of the Haib Copper deposit in the south of Namibia. Haib is one of the largest undeveloped copper deposits in Africa.

    The recent preliminary economic assessment showed that at a price of copper of $3.00 / lb, it generates an after-tax NPV of $950 million and an after-tax IRR of 30%.

    At $4.00 / lb, it generates an after-tax NPV of $1,650 million and an after-tax IRR of 42%. (See the press release here: https://www.deepsouthresources.com/investors/news-releases/deep-south-pea-update-returns-singnificantly-improved-economics/ )

    Deep-South growth strategy is to focus on the exploration and development of quality assets in significant mineralized trends and close to infrastructures in stable countries. In using and assessing environmental friendly technologies in the development of its copper project, Deep-South embraces the green revolution.
     
    #41 Rickydi, May 20, 2021
    Last edited: May 21, 2021
  2. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Pierre Léveillé, CEO of Deep-South Resources about Copper Investment Opportunities

    Deep-South Resources Haib Copper project's PEA demonstrate robust economics for development and is advancing towards a feasibility study.

     
  3. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
  4. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    IR contacts

    Pierre Léveillé CEO
    Telephone: +1-819-340-0140
    [email protected]


    Paradox Public Relations at +1-514-341-0408
     
  5. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Deep-South Resources (DSM) - Targeting Large Copper Resource by Q4/21

    Interview with Pierre Léveillé, President & CEO of Deep-South Resources (TSX-V: DSM)

    The Haib project is a large, low grade project which produced a robust PEA in December and Deep-South is now drilling the high grade section of the deposit.

    They have found high grade zones which will go towards a PFS in 2022 and a new resource estimate in October ‘21.

    Deep-South is also resuming heap leach testing which has been very successful so far.

    The company produced some good drill results in May and have completed 66,000m of drilling with another 10,000m of further in-fill drilling needed for the PFS.

    Between now and the PFS coming out in early 2022, the company is fully funded, after which they will need to raise C$5-7m to fund a further 20-25,000m drill program.

    The first goal for Deep-South is to improve the grade and the second goal is to improve the tonnage of the deposit with extra drilling to add value and transform the deposit into a serious Copper project for the future.

    With the current electrification and Copper thematic, it is good timing for Copper companies and Deep-South is busy drilling now until mid-July and will have results coming out until mid-August.

    The company is also undertaking a scoping study at the project which is looking at alternative power, water usage, future impact study and assess the leach pad.

    Deep-South has a busy result driven 9 month period ahead and will be releasing news and results from their activities between now and the end of the year.


     
  6. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Pierre Leveille, President and #CEO of Deep-South Resources (OTCQB: DSMTF), (TSX: #DSM) presented on the #Emerging #Growth Conference on May 26, 2021. Deep-South Resources (OTCQB: DSMTF), (TSX: DSM) is a mineral exploration and development company. Deep-South is actively involved in the acquisition, exploration and development of major mineral properties in Africa.

     
  7. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    The team at Deep-South Resources (TSX.V: DSM) is actively involved in the acquisition, exploration, and development of major mineral properties in Africa.

    Join President & CEO, Pierre Leveille, Thursday June 10 at 2pmET/11amPT, for a live webinar hosted by Red Cloud Financial Services Inc. He will be discussing the Haib Copper deposit in the south of Namibia and more.

    Register now: https://lnkd.in/eXnGG3H
     
  8. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    2021-06-10 08:04 ET - News Release

    Mr. Pierre Leveille reports

    DEEP-SOUTH INTERSECTS 156 METRES OF 0.46% CUEQ, INCLUDING 24 METRES OF 0.65% CUEQ FROM 26 METRES DEEP

    Deep-South Resources Inc. has provided the second batch of assay results from its current drilling program at its Haib copper project in southern Namibia.

    Significant copper and molybdenum intersections include:

    • HM03: 0.46 per cent copper equivalent over 156 metres, including 24 metres at 0.65 per cent copper equivalent;
    • HM02: 0.39 per cent CuEq over 74 metres, including six metres at 0.73 per cent CuEq;
    • HM04: 0.43 per cent CuEq over 26 metres, including four metres at 0.87 per cent CuEq.
    Pierre Leveille, president and chief executive officer of Deep-South, stated: "We continue to have success with our active drill program identifying thick, higher-grade zones. We are consistently intercepting significantly higher grades than the average grade of our NI [National Instrument] 43-101 indicated resource that stands at 0.31 per cent Cu. The higher-grade zone in pit 2 extends significantly further west and at depth than previously demonstrated. It's increasingly apparent that the use of vertical drilling in the past missed many of the near-vertical structures contained within the broader mineralization of the project. Those near-vertical structures so far are proving to be associated with a higher grade of copper than contained within the current resource. Additionally, the presence of molybdenum has been confirmed with high Mo grades obtained in association with structures and alterations."

    These three holes for which assay results have been received cover about 684.11 metres and were drilled on the central mineralized portion of the deposit to better delineate the extension of this zone to other mineralized areas located to the northwest and southwest. The holes have successfully encountered intercepts of mineralization from bedrock or near bedrock surface. Assay results for the holes are in the attached table.

    Hole From To Width CuEq Cu Mo

    No. Zone (m) (m) (m) (1) (%) (2) (%) (%)


    HM02 Main 64 86 22 0.4 0.4 0.001

    Including 80 84 4 0.95 0.95 0.001

    Main 110 184 74 0.39 0.35 0.013

    Including 118 124 6 0.72 0.66 0.017

    Including 162 168 6 0.73 0.56 0.05

    Main 216 238 22 0.43 0.4 0.009

    HM03 Main 26 182.5 156.5 0.46 0.41 0.015

    Including 26 38 12 0.61 0.59 0.006

    Including 100 130 30 0.58 0.5 0.023

    Including 136 148 12 0.6 0.57 0.01

    Including 152 176 24 0.65 0.64 0.004

    HM04 Main 176 182 6 0.5 0.44 0.017

    Main 194 204 10 0.41 0.41 0.001

    Main 212 238 26 0.43 0.4 0.008

    Including 232 236 4 0.87 0.76 0.034


    1. Width refers to intersection width; true widths have not been determined.


    2. CuEq (copper equivalent) has been used to express the combined value of copper and

    molybdenum and is provided for illustrative purposes only. No allowances have been

    made of recovery losses that may occur should mining eventually result. Calculations

    use metal prices of $3 (U.S.) per pound copper, $10 (U.S.)/lb molybdenum using the

    formula: CuEq per cent is equal to Cu per cent plus (Mo per cent ($10 divided by $3)).

    Borehole locations

    From a figure available on-line it can be seen that all three holes were located in the pit 2 target with HM03 testing the westward extension of the higher-grade portions and HM02 and HM04 the extension of the same northwestward toward the pit 3 target. These drill holes have significantly widened (up to 70 m) the 0.3 per cent and 0.4 per cent Cu pit shells within the top 250 m of the resource.

    Holes HM02 and HM03

    Located on a north-south section line on the western edge of the pit 2 target, HM03 was positioned to test the westward extension of the higher-grade portion of this target while HM02 tested the extension toward pit 3 to the northeast.

    HM03 encountered good grades almost from surface, which continued for over 156 m to the end of the hole. HM02 shows that the higher-grade zone in pit 2 extends significantly farther west than previously demonstrated as well as with depth. Mo grades are highly variable from a low of 0.001 per cent to a high of 0.149 per cent, but averaging 0.014 per cent over the full length.

    Results from HM02 show that although the 0.3 per cent Cu contour extends unbroken between pit 2 and pit 3, the 0.4 per cent Cu contour does not. Additionally, the 0.3 per cent Cu contour extends about 40 m farther toward the northeast than demonstrated previously, as well as with depth. Mo grades are muted for most of the hole (mean of 0.006 per cent) with two intervals returning Mo grades of over 0.05 per cent.

    Hole HM04

    Also drilled on the pit 2 target, HM04 was planned to test the extension of the 0.4 per cent Cu contour northward as well as the continuity of the contour between pit 2 and pit 3. Results were very similar to HM02, demonstrating that (1) the 0.4 per cent Cu contour is broken between pit 2 and pit 3; (2) the limit of the 0.3 per cent Cu contour is significantly larger than previously demonstrated; and (3) the 0.3 per cent Cu contour is continuous with depth. Significant Mo grades are almost entirely absent with the hole and had a mean Mo grade of 0.003 per cent for its full length.


    Drill program update

    Three drill rigs are active on the property. Nineteen holes have been completed and two holes are currently in progress. Results for eight holes have been received and released. A further 11 holes have been completed, processed and submitted to the lab for assay with results pending. The program is planned for 10,000 metres, of which 40 per cent has been completed to date. The Haib copper deposit is one of the oldest porphyry deposits in the world at 1.8 billion years old (Archean). Over time, it has seen several transformations resulting in shearing and faulting events. Those events have concentrated the mineralization along the shears and faults.

    The specific focus of this drilling campaign is to further delineate and grow the higher-grade zone(s) of the Haib deposit uncovered by Deep-South in 2019 with the ultimate goal of establishing a measured resource over that higher-grade section of the deposit. The company also plans to drill a number of holes to depths greater than 350 meters to test the vertical extent of the deposit.

    The MSA Group of South Africa has been appointed to provide an updated NI 43-101 resource estimation after the drilling program completion.

    Quality control

    All drill cores are logged, photographed and cut in half with a diamond saw. Half of the cores are bagged and sent to ALS Laboratories Ltd. in Johannesburg, South Africa, for analysis (SANAS Accredited Testing Laboratory, No. T0387), while the other half is quartered with one-quarter archived and stored on site for verification and reference purposes while the other quarter will be used for metallurgical test work. Thirty-three elements are analyzed by induced coupled plasma (ICP), utilizing a four-acid digestion, and gold is assayed using a 30-gram fire assay method. Duplicate samples, blanks and certified standards are included with every batch and are actively used to ensure proper quality assurance and quality control.

    About the Haib copper deposit

    The Haib copper project hosts a porphyry copper deposit containing an NI 43-101-compliant indicated resource estimate of 457 million tonnes at 0.31 per cent Cu for 3.12 billion lb copper and an inferred resource estimate of 342 million t at 0.29 per cent Cu for 2.19 billion lb copper. Deep-South disclosed a robust preliminary economic assessment (PEA) on Dec. 15, 2020. The press release disclosing the NI 43-101 resource estimation and the PEA reports can be seen at the company's website.

    Please note that:

    • Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for minability, selectivity, mining loss and dilution. These mineral resource estimates are based on indicated mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. However, there is no certainty that these indicated mineral resources will be converted to measured categories through further drilling, or into mineral reserves, once economic considerations are applied.
    • There is no certainty that the preliminary economic assessment will be realized.
    Qualified person

    Dean Richards, PrSciNat, MGSSA -- BSc (honours), geology, is the qualified person for the Haib project as defined by National Instrument 43-101 and has approved the technical disclosure contained in this news release.

    About Deep-South Resources Inc.

    Deep-South Resources is a mineral exploration and development company. Deep-South holds 100 per cent of the Haib copper deposit in the south of Namibia. Haib is one of the largest undeveloped copper deposits in Africa.

    The recent preliminary economic assessment showed that at a price of copper of $3/lb, it generates an after-tax net present value of $950-million and an after-tax IRR (internal rate of return) of 30 per cent. At $4/lb, it generates an after-tax NPV of $1,650-million and an after-tax IRR of 42 per cent. (See the press release available on the company's website.)

    Deep-South growth strategy is to focus on the exploration and development of quality assets in significant mineralized trends and close to infrastructures in stable countries. In using and assessing environmental friendly technologies in the development of its copper project, Deep-South embraces the green revolution.

    We seek Safe Harbor.

    © 2021 Canjex Publishing Ltd. All rights reserved.

    Source : https://www.stockwatch.com/News/Item/Z-C!DSM-3096677/C/DSM
     
  9. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
  10. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Deep-South Resources halted at 5:56 a.m. PT

    2021-06-14 09:01 ET - Halt Trading


    Deep-South Resources Inc. has been halted at 5:56 a.m. PT on Monday, June 14, 2021, at the request of the company, pending news.

    © 2021 Canjex Publishing Ltd. All rights reserved.
     
  11. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Deep-South Resources (CVE: DSM-OTC: DSMTF) President and CEO Pierre Léveillé, joined Stephen Gunnion from Proactive with detail of the second batch of assay results from the company's current drilling programme at its Haib copper project in southern Namibia. Léveillé, telling Proactive that Deep-South continues to have success with its active drill program identifying thick, higher-trade zones.

     
  12. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    DSM Halted at the request of the company
    News Pending
     
  13. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Deep-South's application to renew Haib licence rejected

    2021-06-16 16:02 ET - News Release

    Mr. Pierre Leveille reports

    UPDATE ON DEEP-SOUTH HAIB COPPER LICENCE RENEWAL

    Deep-South Resources Inc. has received notice from the Ministry of Mines and Energy of Namibia informing the company that its application for the renewal of exclusive prospecting licence No. 3140 has been denied, citing the company's inability to advance the licence to prefeasibility and complete the proposed drilling program as planned. The company has requested an urgent meeting with the Minister of Mines and Energy to review and reverse the decision. The company is convinced it is a misunderstanding. The minister has accepted a meeting to discuss the matter. The meeting should take place early next week.

    The company maintains that the ministry was kept well apprised, with no objection on its part, of a proposed change from the prefeasibility study to an upgraded preliminary economic assessment and the commencement of a full feasibility study. Moreover, the ministry issued all permits required for the drilling program and is well aware that Deep-South has completed the drilling program.

    Pierre Leveille, president and chief executive officer of Deep-South, stated: "In the context that the company is well funded and moving ahead with a large development program, the decision of the minister is surprising and certainly not in the best interest of the development of the mineral resources of Namibia. We believe that a meeting with the minister will remove any possible misunderstanding and the situation will be rectified in the shortest time frame possible. We are hopeful that our efforts to meet with the minister will reach a positive outcome."

    In its application for renewal and subsequent representations made to the ministry, the company has clearly demonstrated that it adequately meets the criteria under the Minerals (Prospecting and Mining) Act (Namibia) to justify the renewal of its licence. Accordingly, the company is of the opinion that the refusal is unreasonable.

    The company has demonstrated to the minister that during the past two tenures (from April, 2017, to April, 2021), it has invested $2-million with the completion of, among other things: a National Instrument 43-101 resource estimate; a preliminary economic assessment; a large two-ton sampling and heap-leach test; geological mapping; modelling; and an upgraded preliminary economic assessment. Furthermore, in its renewal application, the company has proposed a feasibility study program with a budget of $7.1-million. The program was under way with three drills and 42 employees on site. METS and CSIRO (Commonwealth Scientific and Industrial Research Organisation) of Australia have also begun metallurgical tests, bioleaching, high-pressure grinding roller tests and a flowsheet optimization program in two laboratories in Australia. Knight Piesold also has four scoping studies under way, covering: water usage; alternative power solutions; leach pad assessment; and environmental path to the ESIA. The company has also informed the ministry that at the completion of the feasibility study, it is planning to build a pilot plant on site for an estimated cost of $25.5-million.

    As a result of the minister's refusal to renew the licence, the company has immediately suspended all work on site and hopes that the retrenchment of its employees will be avoided.

    About Deep-South Resources Inc.

    Deep-South Resources is a mineral exploration and development company. Deep-South's growth strategy is to focus on the exploration and development of quality assets in significant mineralized trends and in proximity to infrastructure in stable countries. In using and assessing environmentally friendly technologies in the development of its copper project, Deep-South embraces the Green Revolution.

    We seek Safe Harbor.

    Source:
    https://www.stockwatch.com/News/Item/Z-C!DSM-3099342/C/DSM
     
  14. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
  15. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    DSM.V

    size------- bid---------------- ask----------------size------------------ volume
    77.5--------0.125------------0.13----------------224.5---------------24,742.0

    The company is convinced it is a misunderstanding. The minister has accepted a meeting to discuss the matter. The meeting should take place early next week


    OTCQB: D[​IMG]SMTF - DEEP-SOUTH RESOURCES INC - U.S.

    14:28:24 EDT

    DSMTF - Q--------last-----0.1016-----------volume-------1,753.5

    We believe that a meeting with the minister will remove any possible misunderstanding and the situation will be rectified in the shortest time frame possible.
     
  16. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Barchart opinion

    Support 0.11¢
    Resistance 0.14¢
    Weak sell

    Damages done by the denial of the ministry to renew the HAIB licence

    I know Pierre Léveillé since his early days running a pubco
    He is a straight shooter

    The minister has accepted a meeting to discuss the matter. The meeting should take place early next week

    DSM believe that a meeting with the minister will remove any possible misunderstanding and the situation will be rectified

    When rectified the stock will gap to 0.19-0.22¢ range
     
  17. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    DSM technical review
    0.125 Pivot Point
    0.195 50% Retracement From 13 Week High/Low
    0.223 Previous Close
    0.225 Price Crosses 40 Day Moving Average
    0.28 13-Week High
     
  18. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Government proximity
    John H. Akwenye, Chairman, Director

    Mr. Akwenye is a Namibian retired lawyer with over 30 years of experience in business development in Namibia. From 1994 to 2008, he was Chairman of Guinas Investents (PTY) Ltd a Swapo owned investment company. He has been chairman of the Namibian Airports Company from 2001 to 2004. He is Director of Corporations such as Areva Resources Namibia and PE Minerals and he his currently Chairman of Deep-South Mining Company (PTY) Ltd and Director of Haib Minerals (PTY) Ltd.

    Current positions of John H. Akwenye


    Deep-South Resources Inc.
    (Diversified Mining) Chairman

    Deep-South Mining Co. Pty Ltd. Chairman

    PE Minerals Namibia Pty Ltd. Director

    Haib Minerals (Pty) Ltd. Director

    AREVA Resources Namibia Ltd. Director

    https://miningdataonline.com/property/3340/Haib-Copper-Project.aspx
     
  19. Rickydi

    Rickydi Active Member

    Joined:
    Nov 11, 2020
    Messages:
    1,271
    Likes Received:
    2
    Sadike Nepela is on the board of Deep-South Resources, Inc....A KEY PLAYER TO HAVE THE HAIB LICENCE RENEWED.......
    Sadike Nepela serves as General Manager of Kalahari Minerals PLC. For a number of years,
    Mr. Nepela served as an Assistant to the Minister in the Namibian Ministry of Mines and Energy and most recently he has been the General Manager for Westport Resources, a subsidiary of Forsys Metals Corp.(listed on the TSX). He is also a Fellow of the International Centre for Research and Training in Major Projects Management, Montreal, Canada. Mr. Nepela is a graduate of the University of Witwatersrand, Johannesburg and has also studied at the University of Connecticut, West Hartford, USA.
     

Share This Page