.................................................................This is the deal......................................... MONTAUBAN PROJECT '''''''''''''''THE MUSCOCHO MINE........... LOCATION: Notre-Dame-de-Montauban 90 HOURS DRIVE FROM MONTREAL CSE Symbol: ESAU OTCQB Symbol: SEKZF FSE Symbol: Z7D Shares Issued and Outstanding:54,739,300 Fully Diluted The project: Recovering Au, Ag & mica from existing mining residues. Production to begin summer 2025 All buidings, aall equipements, water, hydro power, permits are all ssued The average grade for the mining residues located along the railway in the Municipality of Notre-Dame-de-Montauban is 1.21g/t gold and 137g/t silver. Total tonnage calculations for the mining residues are indicated in the NI 43-101 compliant Technical Report on Mineral Resource Estimate and Preliminary Economic Assessment of the Montauban Gold Project to be 27,300 tons. Current gold price per gram is 123US$ and current Silver price per gram is 1.30$US. The cost of milling production for the mining residues material is estimated at $30 per ton. Website : https://esgold.com/ https://esgold.com/corporate/ Leadership, officers, directors and independent consultants https://esgold.com/corporate-policies/ Environmental, Social and Governance https://esgold.com/sustainability/ Best Practices Guidelines in all aspect of the Business & operations Documents available for Due diligence · DEK & Corporate Summary · Resource Evaluation report by JACQUES MARCHAND P ENG GEO, Ordre des Ingénieurs du Québec No 37722 · PEA Claude Duplessis P.Eng. Goldminds Geoservices Inc. & all · 300 tpd mining circuit & flow sheet production to increase to 1,000 tpd · Aerial map & claims map The tailing business is a 20 millions $ profits After all existing veins that were not profitable 20 years ago are at current gold price